Patty at Elm Street Quilts is again challenging us to get something done.

And I must apologize if you are of an age where the last part of my blog title got you singing "that" song from the Herman's Hermits!
But, it is very appropriate for my September goal posting since I plan on working on getting the flimsy done on my Four Patch Stacked Posie.
When last I posted here is where it stood:
I am happy to report that there are now three more rows done (for a total of 4 so far) and I only have 4 more "block" rows to do. Then I need to move on to the sashing rows and the border so that I can complete the quilt top.
With the Labor Day holiday yesterday I was able to make some good progress. And I know that October is going to be tough as far as quilting and other craft work goes so I want to get as much done this month as possible.
So, now that you know what I am doing you can go to Patty's blog and see what others are concentrating on. You can go to her post HERE to see what others are going to be working on in September.
In peace and pieces,
Sherry
This content was originally posted on the quilt blog Books, Hooks, Sticks, etc. (www.bookshookssticksetc.blogspot.com). If you are reading this on any site other than the original or quilterblogs.com it is WITHOUT my permission and the content has been stolen.
1 comment:
Fun blocks. Thanks for linking up with Elm Street Quilts One Monthly Goal and good luck with your project.
Post a Comment