UFO Listing

Showing posts with label All Star quilt. Show all posts
Showing posts with label All Star quilt. Show all posts

Saturday, January 21, 2012

FNSI Project

I didn't get to get as much done last night as I hoped. . . .but I was able to get 2 rows on my latest project:

This is a quilt kit that I purchased so I can't take credit for the fabrics -- which are wonderful.  The pattern is called "All Stars".  It is one of the strip club patterns from Cozy Quilt Designs.

I have three more rows to complete and add to the top; then I have the borders to make it a flimsy.

Part of my goals for this year is to get a handle on my fabric stash and to get moving on the stash of quilt kits that I have accumulated.

I'm thinking that if I work on sewing tops while it is cold I can work on doing the quilting during the summer.  There is some method to my madness here; since my sewing area is in the basement while it is cold I can work with the gas fireplace keeping me warm.  However, in the summer I use a fan -- which could make fabric pieces and patterns float around.

Of course, as with any plans I have made before, everything is subject to change.  I just know that I would like to get more things completed this year than I have in past.

We got some snow (actually it is still snowing) this morning so Mr. Books has to go to work. . . .which leaves me on my own with the TV and the sewing machine.

I hope to be able to post again later today with more progress on this --- or another project.

In peace and pieces,
 

Monday, January 16, 2012

Status Update

Yesterday was a wonderful day! 

Our quilt guild had a mini "retreat" day. . . .meaning that we had the building available to us from 10AM until 4PM.

Mr. Books & I got a little bit of a late start and didn't get there until almost noon. . . but we were able to get started relatively quickly.  Mr. Books was able to complete a quilt top that he started a couple of years ago at a quilt show --- it is a small quilt that we will be completing and donating to either our charity program or sending it to Margaret's Hope Chest for their program.

I started to sew the blocks for the All Star quilt that I had pieced previously.  I was able to get three rows sewn together (and 2 of those rows are attached; the 3rd one is half pinned so it will be attached shortly).

However, that wasn't the only sewing that I have gotten done recently.  I completed the two blocks for the January block of the month drawing (neither of us won); I completed the two blocks for the February block of the month AND I was able to sew 2 additional blocks for one last swap that I was involved in.

Those of you that know me are probably in need of assistance getting off the floor. . . .because my standard mode is that I'm sewing everything at the last minute.  Having February blocks done are definitely a "new" thing for me.

Today is a holiday so I am home.  I would like to get some more sewing done today. . . .at least get the third row on the All Star quilt (there are a total of 10 rows) and perhaps get started on a Christmas gift (so I'm not doing those at the last minute either).

So, need to get moving. . . .housework needs to be done & then I get to "play".

In peace and pieces,
Related Posts Plugin for WordPress, Blogger...